Pipeline & Facility Construction
Let ROS assist you with pipeline, boring, and facility construction. ROS has safely constructed, modified, altered and repaired
hundreds of kilometres of steel, high density polyethylene (HDPE) and flex pipe.
We are certified to work in various terrain throughout Alberta and Northwestern British Columbia.
Pipelines are the safest, most reliable and effective manner of transporting crude oil and other liquid petroleum products. Each year billions of gallons of petroleum are transported thousands of miles, quietly from production fields to refineries to airports, factories, and distribution centres in communities throughout the country.
The ROS core team takes active steps to ensure that health, safety, security and environmental concerns are minimized throughout the entirety of the project.
Click Here to view our Pipeline & Facility Construction Gallery.
![]()
Pipeline & Facility Construction
- 2"-12" steel (50.8mm-304.8mm)
- 2"-16" HDPE (50.9mm-406.4mm)
- Flex pipe certified
- Trench-in/Plow-in
Equipment
| Side Booms | Excavators | Other Equipment |
|
|
|