Doug Rewega, President

Head Office
MD of Mackenzie No.23
Box 630
Rainbow Lake, Alberta
Canada T0H 2Y0
(P)780.956.2370
(F)780.956.3306

Email:
respecos@rainbowcable.ca

Branch Office
MD of Opportunity No.17
Red Earth Creek, Alberta
(P)780.649.2370
(F)780.649.3306

Sub Office
MD of Peace No.35
Duncan First Nation
Peace River, Alberta
(P)780.597.3777

Pipeline & Facility Construction

Let ROS assist you with pipeline, boring, and facility construction. ROS has safely constructed, modified, altered and repaired Pipeline Constructionhundreds of kilometres of steel, high density polyethylene (HDPE) and flex pipe.

We are certified to work in various terrain throughout Alberta and Northwestern British Columbia.

Pipelines are the safest, most reliable and effective manner of transporting crude oil and other liquid petroleum products. Each year billions of gallons of petroleum are transported thousands of miles, quietly from production fields to refineries to airports, factories, and distribution centres in communities throughout the country.

The ROS core team takes active steps to ensure that health, safety, security and environmental concerns are minimized throughout the entirety of the project.

Click Here to view our Pipeline & Facility Construction Gallery.

spacer

Pipeline & Facility Construction

Equipment

Side Booms Excavators Other Equipment
  • 750 LGP
  • 550 LGP
  • 561 LGP
  • D6M LGP
  • PC400LC-7
  • PC300HD-7
  • PC300LC-7
  • PC270LC-8
  • PC2200LC-8
  • Testing Equipment
  • Light Towers
  • Assortment of De-Watering Pumps